A job title is not a certificate scope: state process, material group, position, thickness, pipe diameter and joint type, and a supplier can answer yes or no on day one. Keep two clocks on the page — the six-monthly confirmation and the separate two- or three-year revalidation cycle — because a missed confirmation lapses the qualification either way. Everything else belongs in the document that carries it: geometry in the drawing, parameters in the WPS, hazards in the induction, pay and hours in the contract.
Write one page for one role. By requisition I mean the written requirement you hand to a supplier or turn into an advert. The page has a single job: let a supplier answer yes or no about a candidate on day one. Every field on the page is labelled by the decision it drives — eligibility gate, cost driver, shift fit or retention risk — and every technical detail sits in the document that legitimately carries it. If a field does neither, it comes off the page.
The field triage in this guide is a professional judgement mapping each requisition field to the decision it actually drives; it is a drafting framework, not an official classification, and it measures no outcomes. If you are still settling volume, timing, documents and site readiness, that work belongs in How companies can plan a cross-border workforce request. This page owns what goes on the requisition itself.
What a matchable brief has to do
A brief built on job titles alone gives a supplier nothing to screen against, because an occupation label is not a certificate scope. "Pipe welder" tells the supplier what to call the worker. It does not say whether the worker's qualification covers your pipe, your positions and your materials.
A brief that states process, position, thickness, diameter, material and joint type can be answered on day one. That is the standard to meet. It does not need to be long, and it is not candidate marketing.
| Briefing Field | Weak Briefing (Title-Only) | Matchable Briefing (Scope-Defined) |
|---|---|---|
| Target Role | Fitter | Mechanical Fitter (no welding required) |
| Drawing Literacy | Must read drawings | Interpret isometric drawings and assembly layouts independently |
| Materials & Equipment | Work with metal and tools | Carbon steel and stainless steel piping using pipe benders and grinders |
| Welding Gate | Welding experience a plus | No welding permitted unless qualified under ISO 9606-1 with active six-monthly confirmation |
Every field, and the decision it drives
The table is the checklist. In this guide's field triage, the first block is the eligibility gate: whether a person can do the job at all. The second block covers commercial and deployment factors, not whether a qualified candidate can do the work.
| Group | Field | Decision it drives | Document that carries it |
|---|---|---|---|
| Eligibility | Welding process, e.g. 111, 135, 141 | Gate | Qualification certificate scope, restated in the requisition |
| Eligibility | Material group, e.g. carbon steel, stainless, duplex | Gate | Qualification certificate scope, restated in the requisition |
| Eligibility | Position, e.g. flat, vertical-up, overhead | Gate | Qualification certificate scope, restated in the requisition |
| Eligibility | Thickness range | Gate | Qualification certificate scope, restated in the requisition |
| Eligibility | Pipe diameter range | Gate | Qualification certificate scope, restated in the requisition |
| Eligibility | Joint type, e.g. butt, fillet, branch | Gate | Qualification certificate scope, restated in the requisition |
| Eligibility | Date of last six-monthly confirmation | Gate | Qualification record |
| Eligibility | Validity cycle, 2-year or 3-year route | Gate | Certificate |
| Eligibility | Right to work in the EU, EEA or Switzerland, or valid Slovenian or Croatian residence-and-work permit | Gate | Candidate's own document; not verified by this guide |
| Cost / shift / retention | Shift pattern and rotation | Cost driver, shift fit | Requisition, settled in the contract |
| Cost / shift / retention | Overtime expectation | Cost driver | Contract |
| Cost / shift / retention | Accommodation and travel | Cost driver, retention risk | Contract |
| Cost / shift / retention | Mobility pattern, site-based or travelling | Shift fit | Requisition |
| Cost / shift / retention | Working and site language | Shift fit | Requisition |
| Cost / shift / retention | Site credentials and access | Shift fit, retention risk | Site induction |
| Cost / shift / retention | Start date | Shift fit, retention risk | Requisition |
The guide treats the certificate scope fields — process, material group, position, thickness, pipe diameter and joint type — as eligibility gates in the brief, not price variables: they decide whether a candidate can do the job at all. It treats shift pattern, rotation, overtime and accommodation as commercial or deployment factors; they do not change whether a qualified candidate can do the work.
What is checked after your requirement arrives is covered separately in How Evroproces verifies welders, electricians, pipefitters, and site teams.
| Requisition Field | Triage Category | Decision Driven | Source Document |
|---|---|---|---|
| Welding Process | Eligibility Gate | Decides whether a candidate can do the job at all | Welder Certificate (ISO 9606-1) |
| Material Group | Eligibility Gate | Decides whether a candidate can do the job at all | Welder Certificate (ISO 9606-1) |
| Welding Position | Eligibility Gate | Decides whether a candidate can do the job at all | Welder Certificate (ISO 9606-1) |
| Thickness & Pipe Diameter | Eligibility Gate | Decides whether a candidate can do the job at all | Welder Certificate (ISO 9606-1) |
| Joint Type | Eligibility Gate | Decides whether a candidate can do the job at all | Welder Certificate (ISO 9606-1) |
| Six-Monthly Confirmation Date | Eligibility Gate | Determines if the qualification is active and usable | Welder Certificate / Logbook |
| Shift Pattern & Rotation | Price, Shift Fit & Retention | Moves price, shift fit, and retention; does not change basic eligibility | Employment Contract |
| Overtime & Accommodation | Price, Shift Fit & Retention | Moves price, shift fit, and retention; does not change basic eligibility | Employment Contract |
| Joint Geometry & Dimensions | Out of Scope for Brief | Guides the actual welding work on site; not used for initial screening | Technical Drawing |
| Welding Parameters | Out of Scope for Brief | Guides the actual welding work on site; not used for initial screening | WPS / pWPS |
| Site Hazards & Access | Out of Scope for Brief | Ensures site safety and compliance during execution | Site Induction |
State the scope, not the standard number
The scope of qualification is the range of work the certificate says the welder is qualified to weld. TEC Eurolab states that the scope of validity of a welder qualification depends on process, material, thickness and diameter, position, and joint type. Treat that sentence as the field list.
The consequence is not academic. Therness puts it plainly: "a welder qualified on a 10 mm plate in the flat position cannot automatically weld 30 mm pipe overhead."
Naming EN ISO 9606-1 in the brief does not qualify anyone; what a supplier can act on is the certificate's scope and its confirmation history. Write the scope the job needs. If you know the work but not the standard's variable names, keep the terms plain: process, material, position, wall thickness, pipe diameter, joint type.
Once those fields are set, see Welding industry practice.
The two clocks on a welder qualification
Certification bodies and industry guidance describe a welder qualification as controlled by two independent clocks: a confirmation signed every six months that the welder has kept welding within the original range of qualification, and a separate 2-year or 3-year revalidation cycle. Missing the six-monthly confirmation lapses the qualification regardless of where it sits in that cycle.
DEKRA issues SS-EN ISO 9606-1 welder certificates that are valid for either two years with the possibility of a two-year extension, or three years if the welder is retested every three years — conditional on the welder working within the certified scope and on a signature every six months by a responsible person in the employer's organisation.
That is why the brief asks for the date of the last six-monthly confirmation: a qualification whose confirmation has lapsed is not usable whatever its printed expiry date shows. The revalidation routes themselves are outside this page; see ISO 9606-1 Welder Qualification: Revalidation Routes and Validity Rules.
What belongs in the brief and what belongs elsewhere
Stop adding welding parameters to the brief. A welding procedure specification (WPS) is the written procedure for making a weld; a preliminary WPS (pWPS) is the version used before qualification.
Each technical detail has a document that legitimately carries it — joint geometry and dimensions in the drawing, welding parameters in the WPS or pWPS, site hazards and access in the site induction, and pay, hours, accommodation and notice in the contract; the brief needs only what changes a supplier's ability to select or price a candidate.
| Detail | Lives in | Brief needs to state it? |
|---|---|---|
| Joint geometry, dimensions, tolerances | Drawing | No |
| Welding parameters, preheat, consumables, shielding gas | WPS or pWPS | No |
| Process, position, thickness, diameter, material group, joint type the job needs | Requisition | Yes — gate |
| Certificate scope and confirmation history | Qualification records | Yes — gate |
| Site hazards, access, induction | Site induction | No |
| Pay, hours, accommodation, notice | Contract | No |
DEKRA's process shows why: the test is performed to a WPS or pWPS, the welder is responsible for following the procedure's parameters during the test, and the certificate's scope is defined by the procedure used, not by the job title. ISO 15609-1 specifies the required content of welding procedure specifications for arc welding processes. You state the job's scope; the WPS owns the parameters.
This article verifies no individual certificate, WPS or WPQR, and confirms the requirements of no specific site, contract or collective agreement. A collective agreement is a written agreement between employers and trade unions setting pay and conditions for a sector or company. For the posting frame that makes some fields mandatory, see Compliance: the EU Posted Workers compliance model.
Worked example 1: one welder, the same requirement written twice
Constructed illustration: not a real brief, candidate or recorded outcome.
| Weak brief | Matchable brief |
|---|---|
| Welders needed for pressure pipework. Must have EN ISO 9606-1 and site experience. Minimum three years. | One TIG welder (process 141) for stainless steel pipe, butt welds, 33.7–114.3 mm outside diameter, 2–6 mm wall, positions including vertical-up and overhead. Certificate must cover TIG, stainless group, those thickness and diameter ranges, and butt joints in the required positions. Last six-monthly confirmation within the last six months. Right to work in the EU, EEA or Switzerland, or a valid Slovenian or Croatian residence-and-work permit. Day shift, six-week project, site-based, start date [insert date]. |
All six scope fields are on the right. The left names the standard and asks for experience; no supplier can screen it without a call.
Worked example 2: the same requirement for a pipefitter
Constructed illustration: not a real brief, candidate or recorded outcome. National, sectoral or client-specific schemes may attach their own requirements.
For a pipefitter, the logic diverges from a welder's: the trade title carries no certificate scope, so wherever the pipefitter also welds, the gate is the welding qualification with its defined scope.
| Weak brief | Matchable brief |
|---|---|
| Pipefitter with five years' experience for industrial piping. | One pipefitter to cut, spool, fit and align carbon steel process pipe DN50–DN150, flanged and screwed joints. Must read isometric drawings, set up and tack for welders. Welding not in scope. Right to work in the EU, EEA or Switzerland, or a valid Slovenian or Croatian residence-and-work permit. Day shift, site-based, start date [insert date]. |
If the role also welds, add the six welding scope fields and the confirmation date from Example 1. If it does not, do not paste them in. For the practice page, see Pipefitting industry practice.
Worked example 3: the same requirement for a fitter
Constructed illustration: not a real brief, candidate or recorded outcome.
For a fitter, no certificate scope attaches to the title at all. The brief has to carry drawing literacy, tolerances, materials and equipment instead. Welding is gated only if the role actually welds.
| Weak brief | Matchable brief |
|---|---|
| Mechanical fitter with assembly experience. | One mechanical fitter to assemble and align carbon steel skid frames from drawings, tolerance ±2 mm, using spirit levels, clamps and torque tools. Welding not in scope. Right to work in the EU, EEA or Switzerland, or a valid Slovenian or Croatian residence-and-work permit. Day shift, site-based, start date [insert date]. |
Where a Nordic scheme attaches its own pipefitter or plumber credential rules, that layer is covered in Recognizing Foreign Pipefitter and Plumber Qualifications in the Nordics.
| Brief Element | Weak Brief (Title-Heavy) | Matchable Brief (Scope-Gate) | Welding vs Fitting Logic |
|---|---|---|---|
| Occupational Title | Experienced Pipefitter | Pipe welder (Level 3, OCC0851) | The trade title carries no universal certificate scope; if the role involves welding, the specific welding qualification must be stated. |
| Welding Standard | Certified to standard | ISO 9606-1:2012 | ISO 9606-1:2012 is the active standard for steel; naming it establishes the testing framework but not the specific range of approval. |
| Range of Approval | Any pipe or plate | 30 mm pipe (not limited to 10 mm plate) | A welder qualified on a 10 mm plate cannot automatically weld 30 mm pipe; the welding scope is a hard gate, whereas fitting tasks are work to be done. |
| Technical Detail | Project Drawing | WPS or WPQR | Site Induction | Employment Contract | Qualification Record |
|---|---|---|---|---|---|
| Joint geometry and dimensions | Belongs here | Strike from brief | Strike from brief | Strike from brief | Strike from brief |
| Preheat requirements and joint preparation | Strike from brief | Belongs here | Strike from brief | Strike from brief | Strike from brief |
| Toughness values (27 J at -40 °C, 40 J at -40 °C and 40 J at -20 °C) and tensile strength Rm | Strike from brief | Belongs here | Strike from brief | Strike from brief | Strike from brief |
| Site hazards and access | Strike from brief | Strike from brief | Belongs here | Strike from brief | Strike from brief |
| Pay, hours, accommodation and notice | Strike from brief | Strike from brief | Strike from brief | Belongs here | Strike from brief |
| Six-monthly confirmation signature | Strike from brief | Strike from brief | Strike from brief | Strike from brief | Keep in brief (verify validity) |
| Process, material group, position, thickness, pipe diameter and joint type | Strike from brief | Strike from brief | Strike from brief | Strike from brief | Keep in brief (eligibility gate) |
Your one-page requisition
Copy these fields onto one page. Leave the second column blank until each line is answered.
| Field | Your entry |
|---|---|
| Trade and role | |
| Welding process, if any | |
| Material group | |
| Position | |
| Thickness range | |
| Pipe diameter range | |
| Joint type | |
| Certificate scope required | |
| Date of last six-monthly confirmation | |
| Validity cycle | |
| Right-to-work boundary | |
| Shift pattern and rotation | |
| Overtime expectation | |
| Accommodation and travel | |
| Mobility pattern | |
| Working and site language | |
| Site credentials and access | |
| Start date |
State the scope the job actually needs and stop there; requirements beyond it narrow the pool of candidates whose qualification covers the work without improving the match. The task is finished when every row in the second column is either filled or deliberately struck out because the job does not use it.
| Requisition Field | Decision Driven / Category | Your Entry |
|---|---|---|
| Welding Process | Eligibility Gate (Determines if candidate can weld the joint) | |
| Material Group | Eligibility Gate (Determines parent metal compatibility) | |
| Welding Position | Eligibility Gate (Determines flat, vertical, overhead limits) | |
| Material Thickness | Eligibility Gate (Determines range of approval limits) | |
| Pipe Diameter | Eligibility Gate (Determines pipe size limits, if applicable) | |
| Joint Type | Eligibility Gate (Determines butt vs fillet weld limits) | |
| Last Six-Monthly Confirmation Date | Eligibility Gate (Verifies qualification has not lapsed) | |
| Shift Pattern & Rotation | Commercial / Price (Determines shift fit and retention) | |
| Accommodation Requirements | Commercial / Price (Determines logistics and pricing) | |
| Target Start Date | Logistics (Determines mobilisation timeline and work rights check) |
The follow-up-question test
Read the page as a supplier would. If a question would still need a phone call, the draft is not finished.
| Supplier's question | Gap it exposes |
|---|---|
| Which process and material group? | Scope field missing |
| Which positions, thickness and pipe diameter? | Scope field missing |
| What joint type? | Scope field missing |
| What does the certificate scope need to cover? | Certificate field missing |
| When was the last six-monthly confirmation? | Time field missing |
| Is accommodation, rotation or travel expected? | Cost or shift field missing |
| What shift pattern and start date do you need? | Shift field missing |
| What site credentials must the worker already hold? | Site access field missing |
| Does the worker need EU/EEA/CH work rights or a Slovenian or Croatian permit? | Eligibility field missing |
Add one confidentiality item. If your requirement contains client names, drawings or volumes, ask the supplier to confirm in writing how the requisition and any candidate information will be handled before you send it.
This article is general guidance for employers and workers in the EU posting domain and is not legal advice. It verifies no individual certificate, WPS or WPQR. If the work-rights field is ambiguous, see Who we can place.
| Requirement Field | Weak Brief (Triggers Follow-up) | Matchable Brief (Enables Day-One Matching) |
|---|---|---|
| Standard | Needs to be a certified welder | Must hold a valid certificate under ISO 9606-1 |
| Thickness Range | Capable of welding thick steel | Qualified on a 10 mm plate |
| Diameter Range | Capable of welding pipes | Qualified on a 30 mm pipe |
| Revalidation Method | Up-to-date ticket | Revalidated via Clause 9.3 |
| Confirmation Period | Active welder | Signed confirmation every six months |
| Revalidation Cycle | Long-term certificate | Subject to a 2-year or 3-year revalidation cycle |
| Supplier's Follow-up Question | Gap Exposed in the Brief | Where the Answer Legitimately Belongs |
|---|---|---|
| Which welding process, position, thickness, and material group do you actually need? | Treating 'welder' as a generic job title rather than specifying the certificate's range of approval. | The brief's eligibility gate (certificate scope fields). |
| When was the welder's qualification last signed off by their employer or coordinator? | Relying on the printed expiry date while omitting the critical six-monthly confirmation status. | The brief (qualification history). |
| What are the exact joint geometries, dimensions, and welding parameters? | Overloading the recruitment brief with technical details that do not affect candidate selection. | The drawing and the Welding Procedure Specification (WPS or pWPS). |
| What are the shift patterns, rotation, hourly rates, and accommodation arrangements? | Omitting the commercial and logistical variables that dictate candidate interest and pricing. | The commercial contract or employment terms. |
| Does the pipefitter also need to weld, and if so, to what certificate scope? | Assuming the trade title 'pipefitter' carries a standard, universally recognised certificate scope. | The brief (specifying welding qualifications where the pipefitter also welds). |
If you want Evroproces to respond
Evroproces places candidates who already have the right to work in the EU, EEA, or Switzerland, or who hold a valid Slovenian or Croatian residence-and-work permit. This applies regardless of nationality; the company is not able to sponsor new work visas from outside the EU at this time.
Submitting is optional. The article is complete without it.
Evroproces d.o.o. is a Slovenian workforce solutions agency founded in Maribor in 2014, placing skilled professionals such as welders, electricians, locksmiths, pipefitters, and general-labour teams with companies across the EU and EEA. It maintains five dedicated industry practices: welding, electrical work, pipefitting, locksmithing, and general labour.
Worker placements are made under the company's EU Posted Workers compliance model — the framework of Directive 96/71/EC — with A1 certificates documenting posted workers' social security coverage. A posted worker is someone sent temporarily to work in another country by their employer. An A1 certificate documents which country's social security covers the worker during the posting.
For employers, Evroproces handles the posting paperwork: employment contracts, A1 certificates, social insurance filings, and legal payroll, with an A1 certificate arranged before each posting. Its working domain covers posted workers, A1 certificates, accommodation, payroll, compliance, and site readiness.
When a requirement arrives, Evroproces screens the submitted fields — certificate scope, work-authorisation boundary, timing, shift, mobility, language and site access — against the candidates available to it, and replies with what it can match. The employer still confirms the site-specific technical requirements, the access conditions and the contractual terms. The placement process sets out those steps in detail.
Send the requirement through the employer request form: Request workers.
If you prefer to ask a question first, contact Evroproces at info@evroproces.si or +386 70 630 880; the German-speaking line is +386 70 645 257.
Sources & further reading
- 01Welder's license: what it is, when it is needed and how to get it | TEC Eurolabtec-eurolab.com
- 02ISO 9606-1 Range of Approval: Thickness, Diameter, ...therness.com
- 03SS-EN ISO 9606-1 - welder qualification testing | DEKRAdekra.se
- 04ISO 9606-1 Revalidation: Why It Is Not a “Two Year Ticket” - necitnecitservices.com
- 05ISO 9606-1 Welder Qualification: Revalidation Routes and Validity ...evroproces.com
- 06ISO 15609-1:2019 - Specification and qualification of welding procedures for metallic materials — Welding procedure specification — Part 1: Arc weldingiso.org
- 07The ESCO Classification - European Unionesco.ec.europa.eu
- 08ISO 15614-1:2017 - Specification and qualification of welding procedures for metallic materials — Welding procedure test — Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloysiso.org
- 09User Manual - WeldCalc - SSABweldcalc.ssab.com